Close Menu
Gulf Newsbreak
    What's Hot

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026
    • Home
    • Contact Us
    Facebook X (Twitter) Instagram
    Gulf NewsbreakGulf Newsbreak
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • More
      • Sports
      • Technology
      • Travel
    Gulf Newsbreak
    Home » Goldwind-powered Ummbila Emoyeni Wind Farm Phase One Enters Commercial Operation, Marking a Milestone in South Africa’s Just Energy Transition
    PR Newswire

    Goldwind-powered Ummbila Emoyeni Wind Farm Phase One Enters Commercial Operation, Marking a Milestone in South Africa’s Just Energy Transition

    August 2, 2026
    Share
    Facebook Twitter LinkedIn WhatsApp Pinterest Email Tumblr Reddit VKontakte Telegram

    JOHANNESBURG, Aug. 2, 2026 /PRNewswire/ — The first phase of South Africa’s largest wind farm cluster has entered commercial operation, marking a tangible step in the country’s Just Energy Transition. The Ummbila Emoyeni Wind Farm Phase one, developed by Seriti Green and powered by 25 Goldwind GWH182-6.2 MW smart turbines, has a total capacity of 155 MW. With a rotor diameter of 183.5 metres, it features the largest rotor diameter among all operational wind projects in South Africa to date.

    The commissioning ceremony was attended by South African President Cyril Ramaphosa, Chinese Ambassador to South Africa Wu Peng, Seriti Resources Group CEO Mike Teke and Seriti Green CEO Peter Venn, Goldwind Deputy Chairman and President Cao Zhigang and Business Vice President Wang Hai, alongside national, provincial and local government officials and community leaders.

    The Ummbila complex is designed as an integrated renewable hub comprising 750 MW wind, 150 MW solar PV and 800 MWh energy storage. Following Phase one commissioning, construction of Phases two and three is underway, with full completion targeted for 2027 to establish the cluster as a cornerstone of South Africa’s clean energy transition.

    President Ramaphosa hailed the project as a pivotal milestone for South Africa’s Just Energy Transition and national sustainable development agenda. He commended Goldwind as the wind turbine solution provider behind the project’s successful delivery, stating that the landmark facility is steering the country’s economy and society toward a low-carbon, climate-resilient path and helping fulfil South Africa’s domestic and international sustainability commitments.

    Chinese Ambassador to South Africa Wu Peng congratulated the project on its milestone success, noting that this undertaking stands as a compelling testament to pragmatic and fruitful China-South Africa bilateral collaboration.

    Peter Venn, CEO of Seriti Green, affirmed Goldwind’s vital role in the project’s success. “Goldwind has been our indispensable long-term partner, and we look forward to deepening cooperation on future project phases,” he commented.

    During the ceremony, Goldwind and Seriti Green also signed the cooperation agreement for Phase 4, further deepening their long-term strategic partnership.

    Speaking at the ceremony, Goldwind Deputy Chairman and President Cao Zhigang thanked the South African government, the Chinese Embassy, Seriti Green and all partners. “Ummbila Emoyeni Wind Farm Phase One achieving commercial operation ahead of schedule is proof of the trust and open collaboration we have built. This is not just a wind farm – it is a strategic project that delivers reliable power, drives infrastructure investment, creates local jobs and advances community development. We are delivering more than clean energy; we are delivering a long-term commitment rooted in South Africa.”

    As the first wind project in Mpumalanga Province, the Ummbila complex passed rigorous provincial and national grid connection tests during full-site synchronisation, demonstrating the strong grid adaptability of GWH182-6.2 MW turbines. The units feature customised engineering for the province’s high-altitude wind conditions and frequent thunderstorms. Fitted with an intelligent control platform integrating health diagnostics, load adaptation and grid-friendly technologies, it protects both equipment and power grid under extreme weather.

    During Phase one construction, more than 1,200 jobs were created; peak employment across full cluster is expected to reach 2,000. The project will generate ~480,000 MWh annually – enough for roughly 500,000 households – and cut some 400,000 tonnes of CO₂ each year. With over 50% of wind-sector roles overlapping coal-sector skills, the project offers a practical pathway for local workers transitioning from fossil fuels.

    Goldwind has established a local SCADA monitoring centre and spare-parts hub with 24/7 O&M support, and in 2025 opened a Solution Factory in Cape Town for GWO safety training, drone blade inspection and predictive maintenance.

    Since entering Africa in 2010, Goldwind has operated in South Africa for 16 years under its “In Africa, For Africa” commitment. With Ummbila Emoyeni Wind Farm and other projects, the company’s installed capacity in South Africa is set to exceed 2.2 GW by Q2 2027.

    Learn more at www.goldwind.com

    Photo – https://mma.prnewswire.com/media/3008574/IMG_5665.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/goldwind-powered-ummbila-emoyeni-wind-farm-phase-one-enters-commercial-operation-marking-a-milestone-in-south-africas-just-energy-transition-302840624.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email

    Related Posts

    Ajman Department of Tourism, Culture and Media Receives ‘Star of Outstanding’ Recognition at the 2026 Global Challenge for World Heritage Education Innovative Cases

    August 4, 2026

    PCG Global Closes Pre-Series A to Advance the Middle East’s Energy Transition and Decarbonisation Drive

    August 4, 2026

    ICC Loyalty joins Mintoak to build a unified Payments and Engagement OS for banks

    August 4, 2026

    Coming to America: Africa Business Investment Summit Brings $4 Billion Pipeline to Washington as Investors Seek Growth Beyond Traditional Markets

    August 3, 2026

    HUMAIN Makes Investment in MOZN and Partners to Co-Build Enterprise AI Solutions Locally and Globally

    August 3, 2026

    Roborock Saros 20 Arrives in the UAE & Saudi Arabia – Redefining Clean for Modern Homes

    August 3, 2026
    Latest News

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    NEW YORK / RankWire.AI / – Oil prices surged on July 29, pushing Brent crude…

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026

    DR Congo Ebola outbreak reaches record scale

    August 3, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026
    Business

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026

    Canadian economy grew 0.3% in May report

    August 1, 2026
    News

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026

    Australia reforms National Disability Insurance Scheme rules

    August 1, 2026
    Travel

    May foreign tourist arrivals drive South Korea travel surplus

    July 27, 2026

    flydubai Bangkok flights rise to 14 weekly services

    July 16, 2026

    EU Grants Approval for Enhanced Air Passenger Protections Across Europe

    July 15, 2026
    © 2026 Gulf Newsbreak | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.